Wednesday, July 22, 2026
HomeConstructionEmpty classrooms, quiet halls: Demolition of College Place Elementary paves way for...

Empty classrooms, quiet halls: Demolition of College Place Elementary paves way for new campus

By
Nick Ng

Will you chip in to support our nonprofit newsroom with a donation today?

Yes, I want to support My MLTnews!
An excavator picks up a load of debris as a crew member sprays water to reduce dust from spreading at College Place Elementary School in Lynnwood on July 21, 2026. (Photos by Nick Ng)

The demolition of College Place Elementary in Lynnwood started Tuesday, July 21, as two excavators chewed through two classroom buildings on the south side of campus. This phase will take about seven weeks to complete before construction of the new building begins. A groundbreaking ceremony for the new campus was held in June.

Most of the classrooms and the main office are empty except for debris and a few construction tools scattered around. The auditorium was off-limits since workers dressed in full personal-protection equipment are abating the building before it can be demolished.

In 2024, voters approved the Edmonds School District’s $594 million bond measure with more than 64% support. The bond allocates an estimated $210 million to replace College Place Elementary and College Place Middle schools on their current Lynnwood campus as part of the District’s plan to move sixth grade to middle school and improve educational outcomes.

Cornerstone GCI is the general contractor that is building the College Place Place Elementary and College Place Middle School campuses.

More photos of the campus is on Flickr.

College Place Elementary office.
Some of the students’ artwork that used to hang on the buildings’ walls (see here on June 16, 2026) was saved and will be used in the new building.
This will be the future site of the school bus route on 204th Street Southwest.

The boulders on the north side of campus will be relocated on the new campus.
Farewell messages on the wall before the building will be demolished later in the week.
The last public notice is still on display.

Classroom 24.
Classroom 25.
A sign indicates where a teacher used to teach.
Colorful columns on the east side of the campus.
Construction crew demolition a building. The water reduces the dust.
The former library.
This playground, which was built in the early 2000s, will be removed.

The colorful columns deck the empty hall on the first day of the demolition of College Place Elementary in Lynnwood, July 21, 2026. (Photos by Nick Ng)
The fence and the flagpole are removed.
The office interior is almost empty.

LEAVE A REPLY

Please enter your comment!

Real first and last names — as well as city of residence — are required for all commenters.
This is so we can verify your identity before approving your comment.

By commenting here you agree to abide by our Code of Conduct. Please read our code at the bottom of this page before commenting.

Events Calendar